The full suite of gravity wall and MSE retaining solutions are available for road embankment design including Paragrid, Paraweb, Steel strip and combinations of buried anchor and tieback solutions There are significant cost savings available where gravity and MSE retaining walls are used in combination, particularly in comparison with concrete panel facing and steel strip reinforcement options.

Stone Strong embankment walls and abutment facing units can be placed 2 to 3 blocks above any MSE reinforcement and reinforced block backfill. All components are built from behind using a nominal 20ton excavator without the requirement for propping and bracing.

Due to the simplicity and speed of construction, Head contractors have the option of constructing the wall using their own resources avoiding the need for specialist subcontractors and retaining additional project margin.

Top blocks, angle top blocks (‘Taper Top’ blocks), specialist utility blocks and specialist barrier blocks are also available to compliment the standard block range, providing unrivaled flexibility within a modular block system.